Event Picture Display

Dahisar to Andheri Metro Work

Construction work of Metro (Dahisar to Andheri) resumes during the national lockdown to control the COVID-19 pandemic, in Mumbai on Monday, 27 April 2020.

Tags: Verticallockdown21 day lockdownlockdown in MumbaiCoronaviruscovid 19MetroMumbai Metro

Credit balance: 0

Add to Fotobox