Demolition of Masjid Bun
Image Mumbai 脗路 Aug 15 2009 12:00AM
Crane operators demolish 141-year-old road over bridge at Masjid Bunder station for the extension of the Main line platform from 180 metres to 240 metres to accommodate 12-car coaches in Mumbai on Saturday, 15 August 2009.Main line local trains will halt at Byculla or Dadar, while Harbour line trains will end at Wadala Road station.